In 2025, UzhNU insulated 18,900 m² of façades and technical floors, replaced 6,500 lamps with LEDs, and commissioned a solar power plant with battery storage and a photovoltaic system in a dormitory. In UI GreenMetric, the University’s Energy and Climate Change score rose by 335 points, and UzhNU moved up from 13th to 7th place among Ukrainian HEIs in this category.

Key figures, 2025

IndicatorValue
Electricity consumptionapprox. 4.083 million kWh (60% for heating)
Façades and technical floors insulated (main academic building, Blocks A–D)8,500 + 5,600 m² of façades; 2 × 2,400 m² of technical floors
Radiators replaced / thermostatic valves installed837 / 837
Lamps replaced with energy-efficient ones6,500
Capital repairs under the “Higher Education of Ukraine” project (EIB, NEFCO)works worth UAH 66.4 million
UI GreenMetric, Energy and Climate Change1,310 points (+335); 7th in Ukraine
THE Impact Rankings 2025, SDG 7801–1000 of 1,181

Campus energy efficiency

•     In the main academic and laboratory building, 9,600 m of heating pipes were replaced; individual heating substations with automatic control and heat metering were installed in academic buildings and Dormitories No. 4 and 5.

•     New windows and doors and wall insulation in Dormitory No. 4 provide thermal comfort for 1,800 students.

•     Motion sensors and 80 new light fittings were installed; outdoor lighting at 14 Universytetska Street was reconstructed.

Renewable energy and energy resilience

•     A solar power plant with battery storage was commissioned at the Department of Applied Physics (12 Kapitulna Street), as was a photovoltaic system in Dormitory No. 4.

•     Through the partnership with the University of Lancashire (UK-Ukraine Twinning, Generators4Ukraine campaign), three energy kits were received and integrated with existing PV stations from the NEFCO project: key buildings now have up to 10 hours of backup power.

•     Hybrid inverters with batteries were installed in the library, Dormitory No. 4, Blocks A–D and the server room.

Research

•     Two state-funded early-career researchers’ projects on solid electrolytes for renewable energy storage; a fundamental research project on perovskite materials for solar energy was completed.

•     Contract research for business: a feasibility study for “green” hydrogen production from solar power plants in Zakarpattia (UAH 570 thousand) and solar-wind electric vehicle charging (UAH 75 thousand).